The following standards and test methods are applicable to the construction of slurry systems and may be used to ensure compliance of specifications. AASHTO –...
Breaking – The initial separation of the water from the emulsified asphalt, which can be detected by a marked color change from brown to black,...
Construction Conversions Area or Square Measure 1 square inch (in2) = 6.452 cm2 144 in2 = 1 ft2 = 0.0929 m29 ft2 = 1 yd2...
Suggested Basic Equipment
Suggested File Organization of Construction Records Suggested Records – One of the inspector’s most important responsibilities is to keep accurate and complete project records. Comprehensive...
ISSA A-105 Recommended Performance Guideline for Emulsified Asphalt Slurry Seal The most current version of the ISSA A-105 Guidelines can be downloaded at no charge...