10. Appendices

Test Methods

The following standards and test methods are applicable to the construction of slurry systems and may be used to ensure compliance of specifications. AASHTO –...

Glossary of Terms

Breaking – The initial separation of the water from the emulsified asphalt, which can be detected by a marked color change from brown to black,...

Useful Conversions

Construction Conversions Area or Square Measure 1 square inch (in2) = 6.452 cm2 144 in2 = 1 ft2 = 0.0929 m29 ft2 = 1 yd2...

Inspector’s Equipment

Suggested Basic Equipment

Construction Records

Suggested File Organization of Construction Records Suggested Records – One of the inspector’s most important responsibilities is to keep accurate and complete project records.  Comprehensive...

Recommended Performance Guideline

ISSA A-105 Recommended Performance Guideline for Emulsified Asphalt Slurry Seal The most current version of the ISSA A-105 Guidelines can be downloaded at no charge...